Linkedin Microsoft Project Skill Assessment Answers Updated

Updated LinkedIn Microsoft Project Skill Assessment Exam Questions & Answers




Microsoft Project Quiz – Microsoft Project Multiple Choice Questions and Answers

Microsoft Project Multiple Choice Questions and Answers

Microsoft Project questions and answers with explanation for interviews, competitive examination and entrance test. Fully solved examples with detailed answer 


Microsoft Project Quiz Topics Covered


All Microsoft Project Topics covered to prepare for all Microsoft Project Examinations or job tests. In the below Microsoft Project Quiz, we have arranged the questions from Create a New Plan, Set Up Resources, Resources To Task, Plan Duration Cost. Track progress, Advance Schedule, and Status Reporting, etc. So, the applicants can verify all the questions and learn the unknown concepts. For free of cost, the most expected questions from Microsoft Project and Answers will be available here for all sort of competitive examinations, University examinations etc.


Note:  The most important interview questions asked from Microsoft Projects are given at the end of this Microsoft Project MCQ Mock Test


1. Which of the following is not the default calendar type?

 

Night Shift

Standard

24 Hour

Day Shift


 

2. What is the easiest way to show only the Milestones and Summary Tasks within your project schedule?

 

Click on >View, >Filter, >Milestones

Click on >View, >Group by, >Milestones

Insert the column Milestone, click on the dropdown filter on the column, then choose “Yes”

Using the AutoFilter, filter for “Duration = 0”

 

3. Which of the following is NOT a valid view?

 

Resource Chart

Network diagram

Resource Usage

Task Sheet

 

4. When you create a resource pool, you cannot easily see:

 

A resource hourly cost

Which of the resource’s tasks are on the critical path

How many projects the resource works on

None of the above

 

5. What is a variance threshold for cost or other acceptable variances called?

 

Acceptable Threshold

Variance Limit

Control Threshold

Cost Limit

 

6. You can identify project milestones by:

 

Choosing the appropriate task on the task list and applying boldface

Indenting the task on the task list

Assigning a duration of zero-days to the milestone task

Any of the above

 

7. What are the two ways to filter in Project in MS Projects?

 

Custom Filters

Auto Filters

All of above

None of above

 

8. What are the different types of contour you use in MS project?

 

A. Flat

B. Back-loaded

C. Front-loaded

D. All of the above

 

9. What year was the Macintosh version of Microsoft projects released?

 

1998

1991

1996

1986

 

10. What are the categories of tasks used in MS project?

 

Summary tasks

Subtasks

Recurring tasks

All of these

 

11. The Date Format field can be:

 

Can be collapsed (and expanded) by clicking the triangle to the left of the respective summary task name.

The Date Format can be configured to include time.

Both 1 & 2.

Cannot be configured to include time.

 

12. You would like to add a row at the top of your project schedule that rolls up or sums all the information below.  What is the easiest way to do that?

 

Insert a Summary Task at the top of your schedule and indent all tasks below it.

Enable the Project Summary Task through the Format tab on the Ribbon.

Insert a task at the top of your schedule and establish the predecessors appropriately.

Enable the Project Summary Task through Project tab and Project Information.

 

13. All tasks can be set as recurring.

 

True

False

 

14. What is the best option when deciding on a calendar for your project?

 

You can create a custom calendar each time you start a new project

If you create a custom calendar you do not have to specify a standard, 24-hour, or night calendar

If you specify a custom calendar to use for all projects it will not recognize resource calendars

None of the above

 

15. When you open a new project file, the default view is:

 

A. Gantt View

B. Network View

C. Resource Graph

D. None of the above

 

16. How to set work time exception in Project?

 

Select the project and change the working time

On the calendar choose the day you want to change

Click the exception tab to display it, it will show a column with the name cell in a blank row, type a name for the exception and press enter

 

17. Which of the following is NOT a valid task constraint?

 

FNLT - Finish no later than

FBTD - Finish by this date

MSO - Must start on

ALAP - As late as possible

ASAP - As soon as possible

 

18. The Entry bar:

 

Is for editing the Task and Resource Name fields only

Performs the same functionality as the Space bar

Is displayed by default

1 & 3

None of the above

 

19. You would like to see a list of all the resources and the tasks that they are assigned to. What view best displays this information?

 

Resource Sheet

Task Usage

Gantt Chart

Resource Usage

 

20. There are four tasks in your project, and the duration of your current plan is 22 days. There are FS dependencies between all four tasks. Task A is four days; Task B is six days; Task C is eight days; and Task D is four days. Which of the following changes will create a Project plan with the shortest overall duration?

 

Create a SF dependency between Task B and Task C.

Create a SF dependency between Task A and Task B.

Create a FF dependency between Task A and Task D

Create a SF dependency between Task C and Task D.

 

21. The 'Default start time' in 'Calendar Options':

 

Specifies that the time assigned to the Start field when no time is entered.

Affects the Finish field.

Does not affect the Finish field

1 & 2

1 & 3

 

22. Working with your project sponsor, you determine that a few tasks are out of scope for your project.  You would like to somehow adjust your schedule to eliminate those tasks, but you don’t want to simply delete them just in case they may be needed in the future.  What should you do?

 

Move the task to after the end date of the project

There is nothing else you can do but delete the task

Remove the Predecessor and Successor from the tasks

Inactivate the tasks

 

23. True or False? There is an export to Excel feature for the Task Sheet.

 

True

False

 

24. What are the new features available in MS project?

 

Improved reporting tools

Office 365 Integration

New Project Templates

All the above

 

25. Where can you set fixed duration, effort driven, and manually scheduled?

 

Team Planner

Project Information dialog box

Task form

Resource Sheet

 

26. How can you recognize the timeframe of a new project?

 

It can’t be recognized

Choosing options at a backstage

Clicking on the calendar and setting a timeframe

Choosing the project information in the properties group in the project tab

 

27. What does WBS stand for?

 

Work By Schedule

Work Breakdown Structure

Work Breakdown Schedule

Work By Software

 


28. The PMO manager comes to you because she realizes you have good experience with Microsoft Project 2013.  She is wondering if there is an out of the box view or report that shows Actual Work, Remaining Work and Baseline Work.  Which do you recommend?

 

Project Overview dashboard

Resource Allocation view

Task Usage view

Work Overview dashboard

 

29. Clicking on Open Other Projects displays:

 

The Office.com templates.

The Backstage Open page

The Import Wizard

The Global.mpp

 

30. The formula to calculate Cost Variance is:

 

CV = TV/(AC*TV)

CV = AV + AC

CV = AV/(AC*TV)

CV = EV - AC

 

31. The Project Summary Row:Top of Form

 

Is displayed on row ID = 1

Is displayed on row ID = 0

Is the highest task in your project's Work Breakdown Structure

1 & 3

2 & 3

 

32. What are the types of constraint available in MS project?

 

As soon as possible

As late as possible

Both A and B

None of these

 

33. You would like to see graphically that your milestones have slipped passed the agreed upon Finish dates.  What should you add to the milestones?

 

Finish date

“Must Finish On” constraint

Deadline

“Finish No Later Than” constraint

 

34. Which of the following is not a constraint type?

 

Must finish on

As late as possible

Must start on

As quickly as possible

 

35. You are working on a project that has tasks with no flexibility. Which constraint type offers no flexibility?

 

Must Finish On

Start No Earlier Than

As Soon As Possible

Finish No Earlier Than

36. The ________ new feature in Microsoft Project 2013 allows you to select any task and see the complete chain of predecessors and successors linked to it.

 

Task Overview Chart

Task Path Highlighting

PERT Chart

Resource Graph

 

37. What are the types of constraint available in MS project? 

 

A. As soon as possible

B. As late as possible

C. Both A and B

D. None of these

 

38. What does leveling refer to?

 

Applying duration evenly across resources

Applying work evenly across resources

None of these

Making all tasks the same duration

 

39. In a project, duration can have different units. Which duration unit is not valid?

 

weeks

hours

days

quarters


40. _______ is the length of time by which a task is ahead of schedule and will be completed early if continued.

 

Slack

Lag

Slip

 

41. Microsoft Project uses calendars to schedule a project. Which project components can be assigned a calendar?

 

tasks and work

work and units

resources and work

tasks and resources


42. What character follows an estimated duration?

 

?

~

!

*

 

43. You are working on a project file that contains many linked subprojects. When saving the files, what option can you use to immediately save the open files, including those that have not changed?

 

Yes to All

Yes

Save As

Save

 

 

44. What are the new features available in MS project?  

 

A. Improved reporting tools

B. Office 365 Integration

C. New Project Templates

D. All the above

 

45. When you create a task, you can apply subtasks or sets of subtasks?

 

To main tasks only but not to subtasks

To any task entered in the task list entry table

Only to your main task

None of these

 

46. Which choice is most true about the critical path?

 

It is determined by Microsoft Project’s automatic scheduler

It takes in to consideration the slack allowed for various tasks

It is set as you identify task dependencies

None of the above

 

47. What are the two ways to filter in Project?

 

A. Auto Filters

B. Custom Filters

C. Both of these

D. None these

 

48. If you want to change the hierarchical structure of a task or subtask as part of an outline structure for your project, you need to change the task type or add a deadline date rather than indent or outdent the task.

 

TRUE

False

 

49. What are the new features available in MS project?

 

Better Presentation Tools

New Project Templates

Task Path

All of the above

 

50. A resource is assigned to a task that is scheduled for 2 days. The resource is scheduled for 8 hours (8h) per day at 100%. The resource performs actual work of 10 hours on the first day. How has the Peak for this resource changed?

 

It has changed to 10h.

It has changed to 6h.

It has changed to 125%.

It has changed to 110%.

 

51. ________ determines how tasks and resources assigned to these tasks are scheduled.

 

Schedule

Exception plan

Calendar

Resource pool

 

52. Notes added to a project file can be viewed _______:

 

A. When you roll your mouse over the resource or task with the note

B. When you insert a column called Notes into your task list entry table

C. If you print all pages of your project

D. All of the above

 

53. What is SS (start-to-start)) dependency mean?

 

The work can happen in parallel and the tasks must end at the same time.

The work can overlap or proceed in parallel.

Task 1 must finish before Task 2 can start

Task 2 must finish before Task 1 can start


54. Which two of these are easy: Create a pool of resources, delete resources and add them back in as needed, or share the pool with other managers?

 

A. Create a pool of resources and delete them as necessary

B. Create a pool and share it with other managers

C. Delete resources as necessary and share resources with other managers

D. None of the above

 

55. What is another name for a work breakdown structure?

 

a hierarchy of tasks

a linking of tasks

a duration of tasks

a leveling of tasks

 

56. What are the types of task links in MS project?

 

Finish to start link

Start to start link

Finish to finish link

All of the above


57. A process that states how formal verification and acceptance of completed project deliverables will be obtained is documented in the _______.

 

Procurement Management Plan

Quality Management Plan

Scope Management Plan

Communication Management Plan

 

58. When adding a resource to a task, to only use them fifty percent, type this:

 

Bob[50]

Bob[.50]

Bob(.50)

Bob*.50

 

59. A report for Earned Value Over Time has been requested, You decide to use a Microsoft Project visual report. What values does this report template compare when run?

 

Earned Value. Planned Value, and Actual

Earned Value and Planned Value

Earned Value and Actual Cost

Planned Value and Actual Cost

 

60. If you want to sort your resources by last name so that Brenda Diaz is last on your list and Florian Voss is first on your list, what sort order should you specify?

 

Descending

Z-A

Ascending

A-Z

 

61. What are the categories of tasks used in MS project?

 

A. Summary tasks

B. Subtasks

C. Recurring tasks

D. All of these

 

62. You are about to begin a new project.  Which of the following Resource Types is NOT available in Microsoft Project 2013?

 

Labor   

Material

Work

Cost

 

63. You are preparing a meal comprising a main dish and multiple side dishes. You want the finish of the main dish to drive the finish of the side dishes. The main dish will start before and take longer than the side dishes. You need to create a link from the main dish to each of the side dishes. Which link type is appropriate?

 

Start-to-Finish (SF)

Finish-to-Finish(FF)

Finish-to-Start (FS)

Start-to-Start (SS)

 

65. Out of the following constraints, select the one which doesn't require start or finish date to be added in order to schedule a task in MS Project.

 

A. SNET

B. FNLT

C. ALAP

D. MFO  

 

66. How much should CPI and SPI be in a project ahead of schedule and costs?

 

CPI <1; SPI<1

CPI >1, SPI >1

CPI<1 : SPI>1

CPI>1 ;SPI<1

CPI =1; SPI=1

 

67. What is the smallest denomination of time that can be assigned when assigning duration to tasks?

 

Hours

Days

Seconds

Minutes

 

68. A resource is overallocated in a project. This resource is responsible for two tasks that are to happen at the same time. The first of these tasks is on the critical path. Which solution should you use to remedy the overallocation?

 

Use the Leveling Gantt view adjust the edays field for the second task.

Use the Task usage view to change the second task contour to an early Peak.

Use the Task usage view to change the second task contour to a bell.

Use the Leveling Gantt view adjust the edays field for the first task.

 

69. The _______ is used as a template for other calendars.

 

Task calendar

Project calendar

Resource calendar

Base calendar

 

70. You are in the process of updating your schedule.  You notice that one task has 3 days of Remaining Duration.  You speak with the person assigned to this task and they state that the work is complete.  What should you do?

 

Mark the task 100% Complete

Enter 0 in Remaining Duration  

Enter a status date for the task

Reschedule uncompleted work

 

71. One of these is NOT a type of resource?

 

Schedule

Material

Work

Cost


72. The Team Planner view lets you see:

 

A. How much money each person will cost on this project

B. What tasks each person is assigned

C. The schedule for each person on the team

D. None of the above

 

73. Which of the following is the best way to resolve an issue in which a resource is overallocated?

 

Removing that resource from another task

Changing the resource's availability from 50% to 100%

It cannot be resolved.

Adding another resource to the task

 

74. Notes added to a project file can be viewed __________

 

If you print all pages of your project

When you roll your mouse over the resource or task with the note

When you insert a column called Notes into your task list entry table

All of the above

 

75. SF dependency is ____________?

 

Task 2 must finish before Task 1 can start

Task 1 must finish before Task 2 can start

The work can happen in parallel and the tasks must end at the same time.

The work can overlap or proceed in parallel.

 

76. You would like to see a list of all the resources and the tasks that they are assigned to. What view best displays this information?

 

A. Resource Sheet

B. Task Usage

C. Gantt Chart

D. Resource Usage 

 

77. You would like the ability to edit your typed entries in the Entry Bar, which appears below the ribbon and above the default Entry table in the Gantt Chart view. You recently received a new computer and noticed that the Entry Bar is missing. How do you fix this?

 

78. Microsoft Project was introduced in the year of __________

 

1985

1980

1988

1984

 

79. Use the Display tab in the Project Options dialog box to enable the Entry Bar

 

Change the from Gantt Chart view to Tracking Gantt view.

Use the Advanced tab in the Project Options dialog box to enable the Entry Bar.

On the View tab on the ribbon, in the Split View group, select Details.

 

80. If current data consistently differs from baseline data, this is an indication that ______.

 

your actual data must be incorrect.

you must rework your baseline.

your original plan was never accurate.

your original plan is no longer accurate.

 

81. How do you mark a task's progress and have that progress reflected in the task's summary task?

 

Use the Task tool on the ribbon's Task tab for the subtask.

Enter a value in the %Complete field.

Use the Task tool on the ribbon's Task tab for the summary task.

Use the Project Information dialog box.

 

82. What are the new features available in MS project?

 

A. New Project Templates

B. Better Presentation Tools

C. Task Pathwrong

D. All of the above

 

83. You have many tasks in a project file and want to convert them into milestones. How can you do this?

 

Recreate the tasks and set them as summary tasks.

Set the tasks as summary tasks.

Unassign any resources from the tasks, as resources are not needed for milestone task.

Change the tasks' duration to 0.

 

84. A project has been delayed by three months. In this project, you have set deadlines that also need to be delayed by three months. What feature should you use to accomplish both of these delays?

 

On the Project tab, click Project Information.

On the Task tab, click Move Task.

On the Report tab, click Compare Projects.

On the Project tab, click Move Project.


85. How many default base calendars does Microsoft Project set up for a project?

 

five

three

two

six

 

86. When two tasks have an FS dependency, but the work can overlap or be done in parallel, how can you reduce the overall duration of the project?

 

Change their dependency to SF

Change their dependency to FF

Move the deadline forward so that participants work faster.

Chance their dependency to SS

 

87. A task has a fixed duration If the units on the task are changed, what value for the task will automatically change as a result?

 

allocation

work

contour

effort


88. You are working with subproject files (the master project file is not open) and have saved the changes you made. What happens to the master project when it is opened?

 

The master project will not reflect any changes until the subproject files ate opened as well.

The master project will display an error.

The master project will display message stating that changes were made and the subproject files must be opened first.

The master project will reflect the changes made to the subproject files.

 

89. By default, Work is measured in:

 

Days

Months

Hours

Weeks

 

90. You just updated the Duration of a task.  You notice that the Finish Variance at the “Level 0” or  “Project Summary” row is now showing 5 days.  What does this mean?

 

The project is on schedule

The project is 5 days behind schedule

The project is 5 days ahead of schedule

The project needs rebaselined

 

91. The __________ dialog box allows you select up to three fields for three levels of sorts within sorts.

 

sort

project information

group

 

 

92. You are working with two project files. You want the second project to contain some of the same tasks, along with their work assignments, as the first project. You Choose to copy the tasks between the projects. What else is copied along with the task when performing basic copy and paste action?

 

resources

baseline

calendars

work breakdown structure

 

93. You are working with a master project that contains subprojects, and you want to see a list of tasks on which a subproject file is dependent. How can you do this in Microsoft Project?

 

On the Project tab, click Subproject.

On the View tab, click Group by.

On Project tab. click Links Between Projects.

On the View tab, click Filter.


94. You want to manage multiple projects with one project designated as the master project. Which button on the ribbon do you use?

 

Subproject

Share Resources

Move project

Link Between Projects

 

95. When you create a new blank project in Microsoft Project, what is the default view?

 

Resource Sheet

Task Form

Gantt Chart with Timeline

Detail Gantt

 

96. What is the most accurate way of forecasing EAC and ETC?

 

ETC based on New Estimates

ETC based on based on Atypical Variances

Earned Value

ETC based on Typical Variances


97. A project contains numerous linked tasks. What is the name for a task that is controlled or driven by another task(s)?

 

overlapped

predecessor

callout

successor


98. You have several Microsoft Project files open. One contains sensitive information, so you hide that file. What is true regarding the hidden file?

 

The Switch Window lists the hidden file.

The Switch Window command does not list the hidden file.

To unhide the file, select Switch Window.

To view a hidden file, on the View tab, click Arrange Windows.

 

99. You are using work breakdown structure (WBS) codes for an in-progress project. Due to some schedule changes, tasks have been moved around, which has modified the WBS. How do you fix the WBS codes?

 

From the Project tab on the ribbon, click WBS > Define Code.

From the Project tab on the ribbon, click WBS > Renumber.

From the View tab on ribbon, click Sort.

From the View tab on the ribbon, in the Data group, select Group by.

 

100. When breaking down the work that needs to be done on a project, what is the smallest unit of work known as?

 

work package

duration

work breakdown structure

task assignment

 

101. The Network Diagram, also known as the ______, shows dependencies between tasks in a graphical manner.

 

Resource Graph

Timeline

PERT Chart

Gantt Chart

 

102. A resource's hours have increased over the span of five days for a particular task. The duration has not changed, and the task is effort driven. What element can you add to the Task Usage view to see what has changed?

 

Add a column for the actual duration.

Add a column for the level assignments.

Add a column for the Peak value.

Add a column for the assignment.

 

103. Which of the following is not the default calendar type?

 

A. 24 Hour

B. Night Shift

C. Day Shift

D. Standard

 

104. You are modifying a project's work breakdown structure (WBS) code. What is the default length for any selected sequence type?

 

any

5

3

1

 

105. You have to deliver a new costume sales website by September 30 in time for the Halloween season that begins in mid-October. This is an example of?

 

Project Scheduling

Project Constraints

Critical Success Factor

Deadline

 

106. When launching Project 2013 for the very first time:

 

You will need to set up the your templates before you can use it.

You must change the defaults.

You will be presented with the Welcome to Project tutorial.

The Start screen appears.


107. Setting tasks inactive:

 

Is the same as cancelling it

Greys them out and formats them with Strike through

A task field named Active is set to 'No' for when a task it is inactive

All of the above

None of the above

 

108. Microsoft Projects Linkedin Test Question Answers

 

Saving and creating a project is possible:

From and to Microsoft Word

From and To online solutions like SharePoint, Cloud etc.

To and From Excel

None of the above

 

109. What does CPI of 1.1 mean?

 

Project schedule overrun by 1.1%

Project is completed ahead of costs by 10%

Project completed ahead of schedule by 10%

Project cost overrun by 1.1%

 

110. Which is false regarding Summary Tasks?

 

Can be collapsed (and expanded) by clicking the triangle to the left of the respective summary task name

Can be collapsed (and expanded) by using the Ribbon's View tab > Outline button (within the Data group)

Are formatted in bold

Outdented relative to their sub-tasks and have an Outline Level field number greater its sub-tasks

None of the above

 

111. The Properties dialog is a place where you should consider populating its fields because:

 

These fields will be used in tables and automatically transcribed when running reports

The Comments field allows entering a detailed description of the project's scope

It could help in document retrieval by searching for documents based on their properties

All of the Above

 

112. True or False? When assigning time for projects, you should also account for non-working time.

 

True

False

 

113. The Properties dialog is when setting the Calculate multiple critical paths option in a master project's Advanced settings, which statement is correct?

 

Subprojects will have critical paths calculated individually.

Individual resources will have critical paths calculated.

Milestones will have critical paths fixed.

Only one critical path will be calculated for a linked project.

 

114. What are the types of responsibilities utilized in MS challenge?

 

Routine obligations

Subtasks

Precis duties

All of these

 

115. How can you recognize the timeframe of a new project?

 

A. Clicking on the calendar and setting a timeframe

B. It can't be recognized

C. Choosing options at a backstage

D. Choosing the project information in the properties group in the project tab

 

116. Out of the following constraints, select the one which doesn't require start or finish date to be added in order to schedule a task in MS Project.

 

SNET

FNLT

ALAP

MFO

 

117. What are the types of responsibilities utilized in MS challenge?

 

A. Precis duties

B. Subtasks

C. Routine obligations

D. All of these

 

118. You can identify project milestones by _______

 

 Indenting the task on the task list

Assigning a duration of zero-days to the milestone task

Choosing the appropriate task on the task list and applying boldface

Any of the above

 

119. Creating a template is possible:

 

To help standardize Project Option settings

When Save as type is set to Project Template

From a completed project

From an Excel File

All of the above

 

120. If you're not certain how Task "Chop the Wood" relates to the work of "Move the Chairs", which dependency type should you create?

SS

FS

SF

 

121. The 'Hours per day' field in the 'Calendar options for the Project':

 

Is set to 24 hours per day.

By default is 8 Hours and is used when duration is entered in Days or weeks

No such field exists

Is referred to when Start or Finish is less than 1 day.

 

122. You click on the resource sheet view and notice that one of the resource names appears in Red. What does this mean?

 

The resource is not assigned to any tasks

The resource is over-allocated

The name is misspelled

The resource has not been properly added to the Resource Sheet

 

123. You click on the Resource Sheet view and notice that one of the resource names appears in Red.  What does this mean?

 

The name is misspelled

The resource is not assigned to any tasks

The resource is over-allocated

The resource has not been properly added to the Resource Sheet

 

 

124. True or False? Custom fields created for a resource can be seen on the task sheet view.

 

True

False

 

125. Milestones are: (select two)

 

Created by entering a zero (0) in the Work field

Created by entering a zero (0) in the Duration field

Used to mark deadlines

Used to mark the completion of project deliverables

 

126. You can, using the help of the Task Inspector to: select all

 

Identify task drivers, such as predecessors

Identify task that are over budget

Over allocated resources

All of the Above

 

127. The ________ tab can be used to set working times, add a holiday to the calendar, and set a baseline.

 

Calendar

Resource

View

Project

 

128. The Manually Scheduled icon in the Task Mode field:

 

Contains a "?" if the Work and Task Name fields are left blank

Contains a "?" if the Start or Finish fields are left blank

When the Duration field contains a "?"

None of the above

 

129. Microsoft Project allows up to ___ baselines per project.

 

100

11

2

1

 

130. The Ribbon, the Quick Access Toolbar can be modified:

 

When project plans are closed

When project plans are open

Never

Anytime

 

131. When you create a resource pool, you cannot easily see________

 

Which of the resource’s tasks are on the critical path

A resource hourly cost

How many projects the resource works on

None of the above

 

132. What is another name for a summary task?

 

Hammock task

Overview task

Upper task

High-level task

 

133. You are in the process of creating a new schedule in Microsoft Project.  You want to ensure that all tasks added to the schedule will be “Auto Scheduled”.  What should you do?

 

Under Schedule Options, set New tasks created to “Auto Scheduled”

Under Advanced Options, set New tasks created to “Auto Scheduled”

Use the Task Mode field within the Gantt Chart view to change the value to “Auto Scheduled”

Highlight all tasks and use the “Auto Schedule” button

 

134. You can customize everything in Microsoft Products as per your convenience at any time.

 

In regards to calendars:

There only two, Project and Resource calendars

24 Hours, Night Shift and Standard are three (3) "base" calendars

There are six (6), including the base calendars

 

135. True or False? Displaying or removing a group has an effect on the project data.

 

False

True

 

136. The Global.mpt is a file that:

 

This is a global config file for MSP

This helps drive settings for users

It affects UI of the MSP

All of the above

 

137. When you open a new project file, the default view is

 

Network View

Gantt View

Resource Graph

None of the above

 

138. You can set both a Constraint and a Dependency for a given task

 

True

False

 

139. The Task Mode: select two

 

Affects Duration, Start, and Finish fields

Can be set to Manual- or Auto-Scheduled

Affects Work, Start, and Finish fields

Sets tasks to Fixed Duration

 

140. The critical path method calculates theoretical early start and late start and finish dates. Critical path have either

 

Positive Total Float

Positive or Negative Total Float

Zero or Negative Total Float

Zero or Negative Total Float

 

141. Fixed Duration, Fixed Units and Fixed Work are:Top of Form select two

 

Are all options of the the Task Type field.

Are all options of the the Task Mode field

Can be all be set as defaults

142. You have a task that spans 5 days in Duration, has only one Resource assigned, and consists of 40 hours of planned Work.  Due to a change in a delivery date, you discover that you now need to complete this task in 3 days or less.  You have an additional resource on the team who could help with this task.  How should you configure this task before adding the second resource?

 

Set Type to Fixed Duration, and Effort Driven to Yes

Set Type to Fixed Units, and Effort Driven to Yes

Set Type to Fixed Work, and Effort Driven to No

Set Type to Fixed Work, and Effort Driven to Yes

 

143. What is the process of putting tasks in order of the date they must be completed by?

 

Nesting

updating

Sequencing

Timing

 

144. What are the different types of contour you use in MS project?

 

Flat

Back-loaded

Front-loaded

All of the above

 

145. To see all tasks for a person, which view should you look at?

 

Task usage

Resource sheet

Task sheet

Resource usage

 

146. Entering a start date in the Project Information window:

By default, will cause new tasks to 'start no earlier than' the start date

 

Will cause new tasks to commence on the date you entered as a start date

Will always cause new tasks to start on the current date

None of the above

 

147. Which two of these are easy: Create a pool of resources, delete resources and add them back in as needed, or share the pool with other managers?

 

Delete resources as necessary and share resources with other managers

Create a pool and share it with other managers

Create a pool of resources and delete them as necessary

None of the above

 

148. The Team Planner view lets you see _______

 

What tasks each person is assigned

How much money each person will cost on this project

The schedule for each person on the team

None of the above

 

149. When setting the Calculate multiple critical paths option in a master project's advanced settings, which statement is correct?

 

Subprojects will have critical paths calculated individually.

Individual resources will have critical paths calculated.

Milestones will have critical paths fixed.

Only one critical path will be calculated for a linked project.

 

150. You have a resource on your team who is only available 50% of the time.  She is responsible for working on only one task next week.  The original estimate of Work for this task was 20 hours.  She just informed you that based upon some new found information, the task is really going to take 30 hours worth of Work to complete.  There is no one else that can assist with this task.  How should you configure this task before updating the Work?

 

Set Effort Driven to Yes, then input 30 hours Work

Set Type to Fixed Duration, then input 30 hours Work

Set Type to Fixed Units, then input 30 hours Work

Set Effort Driven to No, then input 30 hours Work

 

151. How to set a deadline in MS project?

 

A. Double-click a task -> it will open a task information dialog box

B. Now, click on the advanced tab

C. Then click on the arrow in the deadline field to show the calendar and then choose a date

D. All of the above

 

152. In order to disable the having the Start Page display when you launch Project 2013:

 

Uncheck Show the Start screen when this application starts checkbox in the Option's General page

Uncheck Show the Start screen when this application starts checkbox from the Ribbon

Uncheck Show the Start screen when this application starts checkbox from the Quick Access Toolbar

You cannot disable the Start Page

 

153. To have Task 10 start three days after Task 9 completes, in the predecessor column, type:

 

T9+3

9FS3

9+3d

All of these

 

154. Project Standard 2013, and Project Professional 2013, differ in what way?

 

Project Standard 2013 permits you to connect to Microsoft Project Server.

Project Standard costs more.

Project Professional 2013 is for advanced user.

One of them permits you to connect to Microsoft Project Server 2013.

 

155. Which choice is most true about the critical path?

 

A. It takes in to consideration the slack allowed for various tasks

B It is set as you identify task dependencies

C. It is determined by Microsoft Project’s automatic scheduler

D. None of the above

 

156. Which one of these is true?

 

Gantt bar formats differ between Manually versus Auto Scheduled tasks

Summary tasks may also be set to Manually Scheduled or Auto Scheduled

Project Summary tasks are Auto Scheduled

All of the above

 

157. What is CPI=?

 

Earned Value /Actual Schedule

EV/AC

Actual Schedule/EV

Actual Cost/Earned Value

 

158. Where can you set fixed duration, effort driven, and manually scheduled?

 

Team Planner

Project Information dialog box

task form

Resource Sheet

 

159. You want to switch the scheduling mode for a project from scheduling from a start date to scheduling from a finish date. This action will change the default constraint from As Soon As Possible to As Late As Possible. Which dialog box should you use to make this change?

 

Resource Information

Project Information

Task Information

Change Working Time

 

160. Which of the following is NOT a valid task constraint?

 

FNLT - Finish no later than

FBTD - Finish by this date

MSO - Must start on

ALAP - As late as possible

ASAP - As soon as possible


161. Your Resource List automatically notifies you:

 

A. Which people earn the least money, thus decreasing project costs

B. When someone is scheduled for a task on his day off

C. Whether someone works full or part time

D. None of the above

 

162. A project contains many elements. What is used to describe the sum of the work required?

 

task links

Resource Sheet

work breakdown structure

baseline

 

163. When you create a task, you can apply subtasks or sets of subtasks:

 

A. Only to your main task

B. To any task entered in the task list entry table

C. To main tasks only but not to subtasks

D. None of the above

 

164. You are in the process of updating your schedule. You notice that one task has 3 days of Remaining Duration. You speak with the person assigned to this task and they state that the work is complete. What should you do?

 

A. Mark the task 100% Complete

B. Enter 0 in Remaining Duration

C. Enter a status date for the task

D. Reschedule uncompleted work

 

165. Your Resource List automatically notifies you________

 

When someone is scheduled for a task on his day off

Which people earn the least money, thus decreasing project costs

Whether someone works full or part time

None of the above

 

166. Which option is not available in the Report tab on the ribbon?

 

New Report

Network Diagram

Recent

Custom

 

167. The default task type in Microsoft Project is ____.

 

fixed work

fixed units

fixed duration

fixed start


168. You are troubleshooting a schedule on someone else's computer The schedule has 10,000 tasks. When a change is made to a task's duration on a Fixed Units task, the start and finish dates do not change. change highlighting does not appear, and the Gantt Chart bat does not update. What is the cause of this issue?

 

Inserted projects are calculated like summary tasks is selected.

Calculate multiple critical paths is not selected.

One of the Com add-ins is not selected.

Calculate project after each edit is set to Off.

 

169. To see how changes to one task affect the rest of the project and to track  schedule changes _____.

 

Resource Leveling

Task Inspector

Gantt Chart

Task Path Highlighting


170. You would like to understand which tasks are critical and which are not. When looking at the Gantt chart, how are these tasks identified by default?

 

Critical tasks are indicated in red and other tasks are indicated in blue.

Critical tasks are indicated in dark blue end other tasks are indicated in light blue.

Critical tasks are indicated in a report while the Gantt chart indicates all tasks in blue.

Critical tasks are indicated with an icon and other tasks are indicated in blue.

 

171. You can set both a Constraint and a Dependency for a given task:

 

True

False

 

172. How to set a deadline in MS project?

 

Double-click a task -> it will open a task information dialog box

Now, click on the advanced tab

Then click on the arrow in the deadline field to show the calendar and then choose a date

All of the above

 

173. To see individual resource details by task, which view should you look at?

 

Task usage

Resource usage

Task sheet

Resource sheet

 

174. You just updated your schedule.  You need a graphical view that shows how your current schedule compares to the Baseline.  Which view should you use?

 

Detail Gantt view

Tracking Gantt view

Leveling Gantt view

Gantt Chart view

 

175. A calendar can be associated with a:

 

Task

Resource and Project

Project

Resource

All of these

 

176. Which of the following is a best practice when estimating the project timeline? Select all that apply.

 

Prove competency by trying to resolve timeline concerns without input.

Work quickly through the planning process to get the project started

Escalate any timeline concerns to stakeholders

Be thorough during the planning process

 

177. After "Pour the Foundation" and "Build the Frame" are both finished, "Mount the Drywall" should start immediately. To put these task relationships in your plan, which dependency types should you create?

 

"Pour the Foundation" Finish-to-Finish with "Build the Frame," and "Mount the Drywall" Finish-to-Start with "Pour the Foundation."

"Pour the Foundation" Start-to-Start with "Build the Frame," and "Mount the Drywall" Finish-to-Start with "Pour the Foundation."

"Pour the Foundation" Finish-to-Start with "Build the Frame," and "Build the Frame" Finish-to-Start with "Mount the Drywall"


178. What is a strategy to overcome the planning fallacy?

 

Add task buffers

Add additional teammates

Expand the project scope

Increase the budget 

 

179. When creating a critical path, what does a network diagram help visualize? Select all that apply.

 

The tasks that can be performed in parallel 

Which non-essential tasks are not on the critical path

The path of work from the start to the end of the project 

Which skilled teammate can work on each task

 

180. Fill in the blank: A Kanban board utilizes cards placed in columns to _________

 

estimate the budget

set the timeline

organize documents

manage tasks

 

181. In manual scheduling, changes to which of the following updates task dates?

 

Project calendars

Constraints

Task dependencies

None of the above

 

182. Gantt charts give project teams a visual representation of project tasks. What else do Gantt charts include?

 

Roles and responsibilities

Resources deliverables, and success metrics

Stakeholder contact information and budget items

Due dates, durations, and milestones 

 

183. ______ is an overlap between two tasks that are linked by a dependency.

 

Lag time

Slip

Lead time

Delayed start time

 

184. You want to switch the scheduling mode for a project from scheduling from a start date to scheduling from a finish date. This action will change the default constraint from As Soon As Possible to As Late As Possible. Which dialog box should you use to make this change?

 

Resource Information

Project Information

Task Information

Change Working Time

 

185. What is the best option when deciding on a calendar for your project?

 

If you create a custom calendar you do not have to specify a standard, 24-hour, or night calendar

If you specify a custom calendar to use for all projects it will not recognize resource calendars

You can create a custom calendar each time you start a new project

None of the above

 

186. You click on the resource sheet view and notice that one of the resource names appears in Red. What does this mean?

 

A. The name is misspelled

B. The resource is not assigned to any tasks

C. The resource is over-allocated

D. The resource has not been properly added to the Resource Sheet

 

187. What tool can a project manager use for organizing all aspects of a complex project?

 

Roles and responsibilities

Resources, deliverables, and success metrics

Work management software 

A digital document

 

188. Which project management tool uses cards to track and visualize task progress?

 

Kanban board

digital document

Gantt chart

spreadsheet 

 

189. You are managing a construction project schedule with key tasks that have dependencies on each other. You need to supply key materials to your team they begin to build different of the building. All materials must be inventoried before they can be used for the project. The completion of the materials delivery and inventory task, which will take longer than the different building sections, will drive the completion of the building sections. You need to create a link from the delivery and inventory task to of building task. Which link type is appropriate?

 

Finish-to-Finish (FF)

Start-to-Start (SS)

Start-to-Finish (SF)

Finish-to-Start (FS)

 

190. Which of the following is NOT true of deadline dates?

 

Deadline dates can affect the total slack on tasks.

Deadline dates indicate a target date you don't want to miss.

Deadline dates affect task scheduling.

Deadline dates can be set on summary tasks and individual tasks.

 

191. You are working on a project schedule. You need two tasks to end at the same time so that your review team can do their work on both tasks. Which link type is appropriate?

 

Start-to-Start (SS)

Finish-to-Start (FS)

Start-to-Finish (SF)

Finish-to-Finish (FF)

 

192. If a task is ______, as resources are added or removed on the assignment, the work remains constant and is redistributed among the resources.

 

ahead of schedule

effort-driven

work-driven

behind schedule

 

193. You want to change the view of the timescale on Gantt chart to be more granular. How many tiers does the timescale support?

 

three

five

ten

four

 

194. When assigning a time duration to a task, what is the abbreviation for "months"?

 

mths

mos

mo

m

 

195. A project currently has a software developer performing two tasks at the same time. The first task is 5 days long; the second task is day long. It has been decided that the developer can take some time to work on the shorter task in the middle the longer task without impacting the schedule. What is the best way to this?

 

Create a link between the tasks with dependency.

Change the first task's contour to Double Peak.

Add lag time of -1d to the second task.

Split the longer task to accommodate the shorter task.

 

196. In a fixed unit task, if you revise Duration, what happens?

 

Timeline is recalculated.

Dependencies are reassigned

Work is recalculated.

Units are recalculated.

 

197. When you begin a new project, you can identify its timeframe by:

 

A. Clicking on the Calendar and setting Timeframe

B. Going back stage and choosing options

C. Going to the Project tab and in the Properties group choose Project Information

D. None of the above

 

198. A graduated scale of rates can be created for a resource by using cost rate tables. What is the maximum number of cost rate tables each resource in a project have?

 

five

ten

six

two

 

199. On the Task tab, the _____ group provides buttons to mark the percent complete, link tasks to one another, and inactivate a task.

 

Task

Data

Properties

Schedule

 

200. On your computer, Automatically add new views, tables, filters, and groups to the global is selected. You are using a custom filter that you created in one of your schedules, and you modify it to better meet your needs. You now notice that this modification is not available in other schedules. How do you fix this?

 

Using More Filters, make a copy of the modified filter.

In the Project Options dialog bays clear and reselect automatically add new views, tables, filters and groups to the global.

Using the Organizer, copy the modified filter from your schedule to global .mpt and replace the filter when prompted.

Using Compare Projects, select the appropriate options from the Task Table and Resource Table lists.

 

201. Which of the following is NOT a risk-diagramming technique?

 

System Flowcharts

Control Diagram

Influence Diagrams

Cause and Effect Diagrams

 

202. You need to modify a resource pool. When opening the file that contains the pool, which option is not valid?

 

Open as read-write into d new master project file.

Open as read-write and allow others to use the pool.

Open as read-only and allow others to use the pool.

Open as read-write while locking others from updating the pool.

 

203. Custom fields created for a task can be seen on the resource sheet view. True or False?

 

True

False

 

204. Which of the following is NOT a valid task constraint?

 

FNLT - Finish no later than

FBTD - Finish by this date

MSO - Must start on

ALAP - As late as possible

ASAP - As soon as possible

 

205. You are the project manager on the rehab of an apartment building. Before you can get the Certificate of Occupancy, which is necessary to complete the project, the wiring must be installed. What type of precedence relationship is this?

 

Finish to Finish

Start to Finish

Start to Start

Finish to Start

 

206. When you create a task, you can apply subtasks or sets of subtasks?

 

A. Only to your main task

B. To any task entered in the task list entry table

C. To main tasks only but not to subtasks

D. None of these

 

207. Project lets you customize the calendar for __________

 

The people working on the project

The materials used on the project

The project duration

The tasks scheduled for the project

 

208. There are four tasks in your project, and the duration of your current plan is 22 days. There are FS dependencies between all four tasks. Task A is four days; Task B is six days; Task C is eight days; and Task D is four days. Which of the following changes will create a Project plan with the shortest overall duration?

 

Create a SF dependency between Task A and Task B.

Create a FF dependency between Task A and Task D

Create a SF dependency between Task C and Task D

Create a SF dependency between Task B and Task C.

 

209. Which of the resources affect task scheduling?

 

Work and Cost

Work

Material

Work and material

 

210. When you create a task, you can apply subtasks or sets of subtasks?

 

To any task entered in the task list entry table

To main tasks only but not to subtasks

Only to your main task

None of the above

 

211. You were just asked to take over a project.  The previous project manager had developed a schedule in Microsoft Excel.  It has 262 tasks, each with Duration in days and Resource Names assigned.  You prefer to manage your projects using Microsoft Project.  What’s the best way to get the information out of Excel and into Microsoft Project?

 

Use the Gantt Chart Wizard

Select all the information in Excel, Copy and Paste directly into Microsoft Project

Open the Excel file directly from within Microsoft Project, which will convert and map Tasks, Durations, and Resources assigned into Project fields

Create a VBA macro

 

212. Which of the following defines the project scope in terms of deliverables and components, and provides the framework on which the project status is based?

 

Work package

Work breakdown structure

Baseline

Milestone

 

213. When you begin a new project, you can identify its timeframe by?

 

Going to the Project tab and in the Properties group choose Project Information

Going back stage and choosing options

Clicking on the Calendar and setting Timeframe

None of the above

 

214. You are in the process of updating your schedule. You notice that one task has 3 days of Remaining Duration. You speak with the person assigned to this task and they state that the work is complete.

 

Enter a status date for the task

Enter 0 in Remaining Duration

Mark the task 100% Complete

Reschedule uncompleted work

 

215. How to set work time exception in Project?

 

A. Select the project and change the working time

B. On the calendar choose the day you want to change

C. Click the exception tab to display it, it will show a column with the name cell in a blank row, type a name for the exception and press enter

D. All of these




The most important interview questions asked from Microsoft Projects


What is the project schedule?


Schedules provide an overview of the project’s milestones, tasks, and dependencies. Tracking a project's progress can be done with it.


Where can you see the project information?

 An overview of all your project's tasks is displayed in the Project view. The table at the top of the view shows summary information for the entire project, and you can expand each row to see more detailed information. You can manage your Projects in Project Manager.


How would you define an appropriate task?

The goal of a project can be achieved by completing an individual task within a project plan. Tasks are specific units of work that must be completed to reach the goal. Whenever possible, tasks can be broken down into smaller steps, but they should always be manageable and achievable within the project's timeline. Planning, researching, executing, and monitoring/evaluation are some of the most appropriate tasks for various types of projects.  

What is a summary task?

You can use summary tasks to group related tasks together, as well as containers for tasks with subtasks in your project plan. Summary tasks can be dependent on other summary tasks, and they can be assigned start and end dates. You can also add text to summarize the contents of a summary task.